Close

Site Information

 Loading... Please wait...
  • Image 1
  • Image 2
  • Image 3
  • Image 4
  • Image 5
  • Image 6
  • Image 7
  • Image 8
  • Image 9
  • Image 10
  • Image 11
  • Image 12
  • Image 13
  • Image 14
  • Image 15

Scripto Long Leads 6 NOS Boxes Extra Strong Standard Diameter E-440 Pencil Lead

$29.89
SKU:
SDN491233196
Condition:
Used
Quantity:

Product Description

Pencil Lead

This is a lot of 6 boxes of pencil lead by Scripto.

Extra strong leads are made in 10 degrees of black and 17 colors.

For all mechanical pencils using standard diameter (.046") long leads.

For drawing or writing.

Box size: 4" long

Good condition. Some boxes have some wear.

Please, take a look at the photos provided.

Take a look at all shipping options.

Thank you for your interest!

Product Reviews

Write Review

This product hasn't received any reviews yet. Be the first to review this product!

Find Similar Products by Category